Project Overview

Arbour House is a 188-bed purpose-built student accommodation building in Clerkenwell, Central London.

As part of a programme of fire safety improvements, Rocburn was chosen to supply 19 bespoke fire-rated windows to replace existing non compliant PVC windows in the building’s communal areas and bathrooms.

The project required a combination of fixed and openable fire-rated windows, allowing the building to retain everyday natural ventilation while meeting the requirements of its fire safety strategy.

Fire Rated Windows
5 2

The Challenge

Fire-rated windows are typically fixed, but at Arbour House, permanently closing off the existing window openings wasn’t a suitable option.

Several areas of the building still required natural ventilation, meaning certain windows needed to remain operational during normal use.

However, in the event of a fire, these windows also needed to close automatically to maintain the fire-resisting barrier.

The challenge was to accommodate both functions within a fire-rated window system.

The Solution

Product Specification
13 × Openable Fire-Rated Windows Bespoke 30-minute fire rated hardwood window assemblies with E30/EI30 glazing, incorporating TOPP ACK4 RWA electric chain actuators for natural ventilation and automatic close on fire functionality.
6 × Fixed Fire-Rated Windows Bespoke 30 minute fire rated hardwood window assemblies with E30/EI30 fire-resisting glazing.

Rocburn supplied 19 bespoke fire-rated window assemblies, 13 openable and 6 fixed units.

Each window was constructed using 30-minute fire rated hardwood and incorporated E30/EI30 fire resisting glazing.

The 13 openable windows were fitted with TOPP ACK4 RWA electric chain actuators, allowing occupants to open and close the windows for everyday natural ventilation.

The actuators have automatic close on fire functionality. When a fire alarm signal is received through the building’s control system, the actuators drive the windows into their fully closed position, helping maintain the required fire resisting barrier.

4 2

Fire Resistance & Compliance

The bespoke window assemblies were manufactured using 30 minute fire rated hardwood and E30/EI30 fire-resisting glazing.

These classifications describe different levels of fire resistance:

  • E30 – Integrity: Provides 30 minutes of fire resistance against the passage of flames and hot gases.
  • EI30 – Integrity & Insulation: Provides the same 30-minute integrity rating, with additional insulation performance to limit heat transfer to the unexposed side.

The window systems were manufactured in accordance with relevant fire resistance and performance testing, including:

  • BS EN 1634-1 – Fire resistance testing of doors, shutters and openable windows
  • BS 476 Parts 20 & 22 – Fire resistance testing
  • BS EN 14351-1 – Windows and external pedestrian doorsets
  • BS 6375-1 – Weathertightness performance
  • BS EN ISO 10077-1:2017 – Thermal performance of windows and doors

The TOPP ACK4 RWA chain actuators are also tested and certified to BS EN 12101-2.

11

Specialist Fire-Rated Window Solutions

The Arbour House project demonstrates how bespoke fire-rated windows can provide natural ventilation while supporting a building’s fire safety requirements.

By combining fire-resisting window assemblies with electric actuation, Rocburn supplied a solution that allows the openable windows to be used for everyday ventilation while providing the necessary functionality for automatic closure in the event of a fire.

Whether you’re replacing existing windows or planning a new development, our team can help you find a suitable solution that meets your building’s ventilation and fire safety requirements.

Related Posts

  • Percy Street 2
    30 Percy Street – Dummy Sash AOV & AOV Activated Door

    We specified a bespoke dummy sash AOV and automatic opening door system for the refurbishment of a Grade II listed building in Fitzrovia, balancing modern fire safety requirements with its historic appearance.

    Published On: 18 September 2026
  • 1-9 Girdlestone Close, Headington
    Girdlestone Close, Headington – Multi Zone Smoke Ventilation System

    A five-zone natural smoke ventilation system for an extension at Girdlestone Close, with façade AOVs integrated into the curtain walling and a roof AOV serving the main stairwell.

    Published On: 21 August 2026
  • BeaconsfieldFilmStudios
    National Film and Television School, Beaconsfield

    Rocburn were asked to repair, replace & upgrade existing manual window opener sets for bottom hung, open in hopper style windows in several areas of the building.

    Published On: 10 December 2024
  • Savannah Heights Benfleet external view 1
    Savannah Heights, Kenneth Road, Benfleet – New Build Smoke Ventilation System

    Savannah Heights, a new development situated in the heart of Benfleet, Essex, comprises 30 luxury flats with 1 and 2-bedroom layouts. We specified components aligned with the fire strategy for both stairwells and smoke shaft.

    Published On: 10 June 2024